Commit Graph

7 Commits (e919a6b871efeb194e4894ad12b0b7f8d34760c8)

Author SHA1 Message Date
Thomas Joise e919a6b871 docs(plan): HQ console redesign — 14-task implementation plan
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
5 days ago
Thomas Joise a925352e70 docs: rewrite HQ plans/specs to be self-contained after the split
The historical HQ-1/2/3a build plans and the live-preview spec referenced sibling
Store apps (apps/store-server, apps/backoffice) as copy-sources and cited Store-only
docs. Rewrote those to describe the patterns intrinsically and to name the Store
product/repo where the scope boundary is genuine, so each plan stands alone in the
HQ repo. Technical content and task lists unchanged.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
5 days ago
Thomas Joise 7afd769a14 docs: live preview plan (13 tasks) + editable template-data scope in spec
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
1 week ago
Thomas Joise 8267ef9257 docs: HQ-3a implementation plan (10 TDD tasks — reports, AWS costs, receipts, company profile)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 1523ebbcce docs: HQ-2 implementation plan (12 TDD tasks — reminders, recurring, AMC, dashboard)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 406839659d chore: bring the full store-product codebase under version control
POS, back office, store-server, all packages, workspace configs, README/
BUILDING, and the WIP HQ-2 plan — everything except gitignored data
(client import staging, .env, local DBs).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 5c3c13c9d3 docs: HQ-1 implementation plan (16 TDD tasks)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago