Commit Graph

7 Commits (8212a9d89843e2f08af8fdbcea1ac75aed5cef50)

Author SHA1 Message Date
Thomas Joise 8212a9d898 docs: quotation polish + share/download design (beautify, tokenised share link, whatsapp, native share)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
1 week ago
Thomas Joise 7afd769a14 docs: live preview plan (13 tasks) + editable template-data scope in spec
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
1 week ago
Thomas Joise 152545555e docs: live document preview design (approved via ultracode panel)
Same-code preview endpoint (no drift), form+A4-paper split layout, server-truth
totals strip, permissive-preview/strict-save, + company-letterhead / quote-content /
reminder-email sibling previews. Store-product surfaces documented as handoff.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
1 week ago
Thomas Joise 8267ef9257 docs: HQ-3a implementation plan (10 TDD tasks — reports, AWS costs, receipts, company profile)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 1523ebbcce docs: HQ-2 implementation plan (12 TDD tasks — reminders, recurring, AMC, dashboard)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 406839659d chore: bring the full store-product codebase under version control
POS, back office, store-server, all packages, workspace configs, README/
BUILDING, and the WIP HQ-2 plan — everything except gitignored data
(client import staging, .env, local DBs).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago
Thomas Joise 5c3c13c9d3 docs: HQ-1 implementation plan (16 TDD tasks)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2 weeks ago